Installation
Check before connecting​
Before powering SOL-LED check:
- stabilized power supply
12-24 V DC; - correct polarity on
+and-; - maximum current of each output not exceeding
2,5 A; - compatible LED loads;
- correct tightening of the clamps;
- absence of exposed wires or short circuits.
Connect the power​
Before connecting the wires, see the diagram in Panel, Indicators and Terminals. The 230 V mains must only reach the external power supply; SOL-LED receives only stabilized 12-24 V DC.
- Turn off the power supply.
- Connect the positive of the power supply to the
+terminal. - Connect the negative of the power supply to the
-terminal. - Check the polarity again.
- Power the device.
Do not connect the device directly to the 230 V AC network.
Connect the LED bars​
Choose the type of output based on the bar used.
For SeasonGenerator PRO bars use OUT-SG-1 and OUT-SG-2.
For 2-wire commercial LED bars use OUT-1 and OUT-2.
Do not use incompatible links on the same bar at the same time.
First ignition​
When first turned on or after loss of saved parameters, the device loads default values and sets the clock.
Main default values:
| Parameter | Default |
|---|---|
Sunrise duration | 10 minutes |
Sunset duration | 10 minutes |
Inspection time | 1 minute |
Inspection time | 1 minute |
Night Light | OFF |
Max. Brightness | 80 % |
Energy saving | Disabled |
Language | Italian, if the saved value is invalid |
Recommended configuration​
- Set time and date.
- Select your language.
- Select the room to configure with the right arrow.
- Choose the program.
- Set
Sunrise durationandSunset duration. - Set
Max Brightness. - Configure any night light, inspection and energy saving.
- Repeat for the other room, if used.